726 B
726 B
One checkpoint list drives the whole Run tab
Tebra Auto Post keeps two overlapping lists:
- 8 steps, which move forward when known phrases appear in the log (
STEP_MARKERS). - 7 checkpoints, which move forward on
[CPSTATE]lines and have time limits.
The Run tab skill keeps one checkpoint list. The bot's [CPSTATE] active|done N lines move the step list, the checkpoint boxes and the progress % together. The screen still looks like Tebra.
Why: there is one list to ask the user for, so the skill fits in 5 minutes. And a typo in a log phrase can no longer stall the progress bar without anyone noticing.
Cost: the progress bar moves in whole checkpoints, not Tebra's finer per-phrase percentages.