Commit Graph
2 Commits
Author SHA1 Message Date
VasanthandClaude Opus 5.5 50ea723bc6 Add the MEK Charge Reconciliation Handover SOP for ops
3-page SOP written with the rpa-bot-handoff skill: how to run it from the
web address, what shows where during a run, the result and the Excel
Result values, 15 problem messages (E01-E15) with what to do, and the
email to send (To the developer, CC the manager). The PDF goes to ops; the
.md is the source, the .docx the editable copy.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-28 17:11:49 +05:30
VasanthandClaude Opus 5.5 6616c91b7f Branding, Excel watermark, live run progress, and uv
- Login and Reports pages: eCare logo, Waystar and Aquilaehr logos (light
  versions for the dark pages), eCare favicon.
- Excel reports: faded eCare/Waystar/Aquila watermark as the sheet
  background on both sheets. Report writer moves to xlsxwriter, the only
  engine that can set a sheet background.
- Reports page: animated run progress (both download lanes piped into the
  Excel sheet) and a plain-language activity feed built from the run log;
  the raw log stays under "Technical log". /status now returns the
  location count.
- Dependencies move from requirements.txt to pyproject.toml + uv.lock;
  Dockerfile installs uv from PyPI and runs uv sync --frozen.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-28 14:43:31 +05:30